The third phase of Hangzhou Qige Wastewater Treatment Plant (sewage volume 1.2 million tons / day)- 韦德国际亚洲官方【首选品牌】

The third phase of Hangzhou Qige Wastewater Treatment Plant (sewage volume 1.2 million tons / day)



In 2008, 14 sets of P5-2.2 centrifuges of our company were used. The 3 single-machine processing capacity was 56m/h·day, the scale of the 4 3 sewage  treatment  plant  was  60×10m/d,  and  the  production  was absolutely dry 153.12TDS/d; the concentration of  sludge entering the centrifuge was 1.2. ~2.0%, the average is 1.6%, the liquid is clarified, and the moisture content of the slag cake is 78%.
04-29